Engaging Third Party Inspection Agency for the work of Design, Engineering, Supply, Construction, Erection, Testing and Commissioning of 1 MW (AC) Solar PV Power Plant at Haldia Dock Complex, Kolkata Port Trust
0
0
Engaging Third Party Inspection Agency for the work of Design, Engineering, Supply, Construction, Erection, Testing and Commissioning of 1 MW (AC) Solar PV Power Plant at Haldia Dock Complex, Kolkata Port Trust
For more information please see below link:
Related posts:
- Solar Powered Navigational Buoy Light System
- Erection of Solar Mini High mast light model 4
- Supply of 466 pumps along with O&M for 5 Years for replacement of existing AC pumpsets with grid connected DC Solar Pumping Systems
- Gujarat Floats Tender for 110 MW of Solar Projects to be Set Up at various GETCO Substations
tags:
Kolkata Port Trust