![EOI for selection of Developers/ Bidders/land owners for setting up of 50 MW Cumulative Capacity Solar Power Plant for AG feeder on pilot basis.](https://www.eqmagpro.com/wp-content/uploads/2017/12/download-7-4.png)
EOI for selection of Developers/ Bidders/land owners for setting up of 50 MW Cumulative Capacity Solar Power Plant for AG feeder on pilot basis.
68
0
Revised – Invitation of EOI for selection of Developers/ Bidders/land owners for setting up of 50 MW Cumulative Capacity Solar Power Plant for AG feeder on pilot basis.
For more information please see below link: