Establishment of Off-Grid 5.5 KWp PV Solar System
0
0
Establishment of Off-Grid 5.5 KWp PV Solar System and Battery Banks at Kaup Lighthouse under DLL Goa
The last date to submit the bids is February 22, 2021
For more information please see below link:
Related posts:
- Design, manufacture, supply, erection , testing and commissioning of Solar Water Heating Systems ((ETC Type) of different capacities in H. P. according to the latest BIS
- Supply, Installation, Testing and Commissioning of 15 KWp Grid Tied Solar Power Plant at 7/6 AMDA Bldg Sirifort Institutional Area New Delhi
- Supply and Installation of Solar Tree 1.8 kW
- Eastern Coalfields Floats Tender for 1415 kwp Roof top Solar Projects At 26 locations