![ESTABLISHMENT OF SOLAR PV POWER PLANT OF CAPACITY 100 MW (AC) in CG STATE](https://www.eqmagpro.com/wp-content/uploads/2019/11/ESTABLISHMENT-OF-SOLAR-PV-POWER-PLANT-OF-CAPACITY-100-MW-AC-in-CG-STATE.jpg)
ESTABLISHMENT OF SOLAR PV POWER PLANT OF CAPACITY 100 MW (AC) in CG STATE
0
0
ESTABLISHMENT OF SOLAR PV POWER PLANT OF CAPACITY 100 MW (AC) in CG STATE ALONG WITH COMPREHENSIVE OPERATION AND MAINTENANCE FOR A PERIOD OF 25 YEARS
For more information please see below link:
Related posts:
- Acquisition and Handover of Land & Supply of Solar PV Power Plant of capacity 100 MW in Gujarat
- Supply and Installation of Off Grid 20kWp Solar Photo Voltaic Plant at Swagat RO Piprakothi under Muzaffarpur DO of Bihar State Office
- Supply, Installation, testing and Commissioning of 40 kWp Grid Connected Roof Top Solar PV System at HPO Dhanbad under Jharkhand Circle
- Solar System for Bamboo Research and Training Centre at Chichpalli
tags:
Coal India Limited