Extension-03 for NIT for and behalf of BDL of 5 MW(AC) Solar PV Power Plant at BDL Bhanur,Telangana
Extension for “NIT for and behalf of BDL for Design, Engineering, Procurement, Supply, Construction, Erection, Testing, Commissioning and O&M(5 years) of 5 MW(AC) Solar PV Power Plant at BDL Bhanur (Medak) in the state of Telangana.” Solar Energy Corporation of India Limited (SECI) on behalf of Bharat Dynamics Limited (BDL), The Employer, invites online bids from eligible bidders on Single stage – Two envelop bid system in the prescribed forms and formats, for setting up of 5 MW (AC) Solar Photovoltaic Power Plant at BDL, Bhanur, District Medak in the state of Telangana (India), on turnkey basis and thereafter comprehensive Operation & Maintenance for 5 years of the Plant, as per the Scope of Work mentioned hereinafter. A qualified bidder needs to set up the total capacity of 5 MW (AC) Power Plant at the designated location.
The last date of bid submission has been extended to 17:00 hrs, 20th September, 2016. Prospective bidders are requested to refer to TCIL website for details.
Tender Search Code: SECI-2016-TN000032
Related posts:
- Design, Supply, Installation, testing and commissioning of On-Grid Captive Solar Photo Voltaic (SPV) System
- AMC for 02 x 50 KWP Off Grid Solar Power Plant at Keithalmanbi, HQ 9 Sect AR
- Supply and Installation of roof top solar system for computer room of Vananchal college, North Karanpura
- Solar Works for 1 MW Solar Power Plant at Thiruvananthapuram