EXTENSION OF BID SUBMISSION DATE W.R.T. 2500 MW ISTS CONNECTED WIND SOLAR HYBRID POWER PROJECT (ISTS-HYBRID1)
146
0
This has reference to the : for Selection of Hybrid (Solar Plus Wind) Power Developer for setting up of 2500 MW ISTS connected Wind Solar Hybrid Power Project (ISTS-Hybrid1).
The last date of bid submission is hereby Extended till 20.09.2018 (16:00 Hrs). All Prospective Bidders are requested to stay updated from TCIL website (www.tcil-india-electronictender.com) for more details.
Tender Search Code (TSC): SECI-2018-TN000020
Source: seci.co.in
Related posts:
- Solar Energy Could Power 13% Of The World By 2030
- TENDER FOR 20 MW (AC) FLOATING SOLAR PV POWER PLANT WITH 60 MWH BESS INCLUDING 10 YEARS PLANT O&M AT UNION TERRITORY, LAKSHADWEEP, INDIA
- BREAKING – Gujarat Non Solar Park 500 MW Tender Results
- Import duty on solar modules to rise to 40 per cent in a year