Extension of ” Design,Engineering, Manufacture, Supply, Storage, Civil Work, Erection of Suitable Structure, Testing & Commissioning of Roof Top Solar PV Project Including Operation And Maintenance (O&M) of the Project In Resco Model For A Period Of 25 Years At Station/Site Of Mumbai Metro Rail Project for Line 7 & 2A totalling around 7.63 MWp.”
31
0
Extension of ” Design,Engineering, Manufacture, Supply, Storage, Civil Work, Erection of Suitable Structure, Testing & Commissioning of Roof Top Solar PV Project Including Operation And Maintenance (O&M) of the Project In Resco Model For A Period Of 25 Years At Station/Site Of Mumbai Metro Rail Project for Line 7 & 2A totalling around 7.63 MWp.” (Opens New Window)
For more information please see below link:
Related posts:
- Pune Metro Issues Tender for 5 MW of Solar PV Projects at 10 Stations & 2 Depots
- IMPLEMENTION OF GRID CONNECTED ROOF TOP SOLAR PV SYSTEM FOR LT DOMESTIC CONSUMERS IN TIRUPATI AND VIJAYAWADA IN APSPDCL
- PROVIDING AND INSTALLATION 7.5HP (AC) SOLAR PUMP
- CONSTRUCTION OF SOLAR ENERGY BASED DUAL 1 HP DC PUMP
tags:
MMRDA