EXTENSION OF EOI SUBMISSION DEADLINE : SELECTION OF OWNERS ENGINEER (OE) FOR 160 MW SOLAR-WIND HYBRID POWER PLANT WITH BESS AT RAMAGIRI, ANANTAPUR DISTRICT, ANDHRA PRADESH, INDIA
Amendment 1:
Extension of EOI submission Deadline
Employer: Solar Energy Corporation of India Limited (SECI), New Delhi, India
Project: Innovation in Solar Power and Hybrid Technologies Project
Expression of Interest (EOI) title: Selection of Owners Engineer (OE) required during Design, Engineering, Supply, Construction, Erection, Testing & Commissioning of 160 MW Solar-Wind Hybrid Power Plant with BESS including Plant O&M at Ramagiri, Anantapur district, Andhra Pradesh, India
Ref No: IN-SECI -101391-CS-QCBS
Existing Date & Time of EOI Submission: 16.03.2019 till 1800 HRS
Revised Date & Time of EOI Submission: 25.03.2019 till 1800 HRS
Revised Date & Time of EOI Opening: 26.03.2019 at 1100 HRS
Consulting firms are requested to remain updated for any notices wrt the EOI document through the websites www.seci.co.in as no separate notification will be issued in this regard.
Source: seci.co.in
Related posts:
- PRE-BID MEETING & SITE VISIT NOTIFICATION: RFB FOR 160 MW SOLAR-WIND HYBRID POWER PLANT WITH BESS AT RAMAGIRI, ANANTAPUR DISTRICT, ANDHRA PRADESH, INDIA
- STAKEHOLDERS CONSULTATION MEETING : SECI’S 160 MW SOLAR-WIND HYBRID PROJECT WITH BESS AT RAMAGIRI, ANDHRA PRADESH, INDIA
- AP govt reviewing PPAs in public interest: Official
- Jagan Mohan Reddy briefs PM Modi on corruption in PPAs, reiterates SCS request