Extension of the period for interchange in power of Unit 8 (250 MW) of Barauni Thermal Power Station
0
0
Extension of the period for interchange in power of Unit 8 (250 MW) of Barauni Thermal Power Station Stage-II (2×250 MW) beyond six months from initial synchronization. NTPC Limited