1. Home
  2. Policy & Regulation
  3. Filing of Petition for Tariff adoption for Procurement of 250 MW (AC) Solar Power from Grid Connected Ground Mounted Solar Power Plants to be set up in the State of Bihar on Long Term basis – EQ Mag Pro
Filing of Petition for Tariff adoption for Procurement of 250 MW (AC) Solar Power from Grid Connected Ground Mounted Solar Power Plants to be set up in the State of Bihar on Long Term basis – EQ Mag Pro

Filing of Petition for Tariff adoption for Procurement of 250 MW (AC) Solar Power from Grid Connected Ground Mounted Solar Power Plants to be set up in the State of Bihar on Long Term basis – EQ Mag Pro

0
0
Anand Gupta Editor - EQ Int'l Media Network