For enforcement of ‘must run’ status granted to solar power project and & seeking direction to State Load Dispatch Centre to stop issuing backing down instruction to the Petitioner
0
0
Petition invoking Regulation 1.5(iv) read with Regulation 5.2(u) and Regulation 6.5(11) of the Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010 for enforcement of ‘must run’ status granted to solar power project and Regulation 11 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 seeking direction to State Load Dispatch Centre to stop issuing backing down instruction to the Petitioner
For more information please see below link:
Related posts:
- In the matter of: Petition for relinquishment of the Long-term Open Access under the Bulk Power Transmission Agreement
- Seeking extension of time period for achieving the Commercial Operation Date of project and other consequential reliefs under the BPTA
- In the matter of: Petition for adoption of tariff for 600 MW Solar PV Projects (Tranche-II) connected to the Inter-State Transmission System
- Petition for revision of tariff of SUGEN Power Plant (1147.5 MW)