1. Home
  2. Policy & Regulation
  3. For enforcement of ‘must run’ status granted to solar power project and & seeking direction to State Load Dispatch Centre to stop issuing backing down instruction to the Petitioner
For enforcement of ‘must run’ status granted to solar power project and & seeking direction to State Load Dispatch Centre to stop issuing backing down instruction to the Petitioner

For enforcement of ‘must run’ status granted to solar power project and & seeking direction to State Load Dispatch Centre to stop issuing backing down instruction to the Petitioner

0
0

Petition invoking Regulation 1.5(iv) read with Regulation 5.2(u) and Regulation 6.5(11) of the Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010 for enforcement of ‘must run’ status granted to solar power project and Regulation 11 of the Central Electricity Regulatory Commission (Conduct of Business) Regulations, 1999 seeking direction to State Load Dispatch Centre to stop issuing backing down instruction to the Petitioner

For more information please see below link:

Anand Gupta Editor - EQ Int'l Media Network

LEAVE YOUR COMMENT

Your email address will not be published. Required fields are marked *