Goa State Pollution Control Board Issue Tender For upgrading the installed 45 kWp on-grid Solar System to ensure 24×7 power supply – EQ Mag Pro
0
0
Goa State Pollution Control Board Issue Tender For upgrading the installed 45 kWp on-grid Solar System to ensure 24×7 power supply.
For more information please see below link:
Related posts:
- 45 kWp Grid Connected Roof Top Solar PV System at Meghdoot Bhawan, Patna
- Supply of 45 KWp Capacity Grid Connected Solar PV Power Plant at Various PHCS in Osmanabad
- Supply of 40 KWp On Grid Solar System at Forest Station
- Directorate Of Municipal Administration Issue Tender For Supply of 45 KWP Solar Power Plant For Palkhi Tal