Goldwind Announces New GW 6S Offshore Smart Wind Turbine Platform
First commercial deployment of offshore turbines for China’s largest wind turbine OEM.
BEIJING — Xinjiang Goldwind Science & Technology Co., Ltd, (Goldwind) (SZSE: 002202) (HK: 2208), launched its latest GW6S offshore platform at last month’s China Wind Power exhibition. The 6S turbine platform includes three new offshore wind turbines. All models, the GW154/6.7MW, GW164/6.45MW and GW171/6.45MW form competitive solutions for high, medium and low wind conditions. The turbines are available with rotor diameters ranging from 154 to 171 meters and are a direct evolution of Goldwind’s leading Permanent Magnet Direct Drive (PMDD) turbine technology.
In September, the first blades for the 6.7MW offshore prototype with a length of 75.1 meters were produced. A prototype of the GW154/6.7MW will be installed in early 2018 and is designed for wind class I areas off the Fujian and Guangdong coast, east of China.
The turbine’s expected commercial deployment is during the first quarter of 2018 and target offshore markets outside of China include Japan, South Korean and, later, Europe.
About Goldwind
Xinjiang Goldwind Science & Technology Co., Ltd is a world leading wind turbine technology and energy solutions provider (SZSE: 002202) (HK: 2208). With more than 40 GW of capacity worldwide, Goldwind’s revolutionary Permanent Magnet Direct Drive (PMDD) technology is shaping a new standard in wind energy. Goldwind offers a full suite of innovative renewable energy solutions, including equipment manufacturing and sales, service, and investment. To learn more, visit www.goldwindinternational.com