![Grid-Connected Solar PV Power Plant of 56 KW For 7 Nos of Primary Health Center in Wardha](https://www.eqmagpro.com/wp-content/uploads/2020/09/MEDA-Issues-EoI-For-Supply-Of-Solar-Lantern-And-Solar-Study-Lamps-In-Maharashtra.jpg)
Grid-Connected Solar PV Power Plant of 56 KW For 7 Nos of Primary Health Center in Wardha
0
0
SOLAR PV POWER PLANT WITH FULL LOAD BATTERY BACK UP (HYBRID SYSTEM) FOR 4 HRS UNDER ROOF TOP NET METERING WITH CAPACITY OF 8 KW, AT EACH PRIMARY HEALTH CENTER AND TOTAL 56 KW FOR 7 NOS OF PRIMARY HEALTH CENTER IN WARDHA DISTRICT.
For more information please see below link: