Hiring of Consultant for preparation of Pre-Feasibility Report for development of 30 MW Solar Power Project
54
0
Hiring of Consultant for preparation of Pre-Feasibility Report for development of 30 MW Solar Power Project
For more information please see below link:
Related posts:
- Annual Rate Contract for tentative aggregate capacity of 50 MWp of Grid Connected Rooftop Solar Power Plants, without battery bank (with Net Metering Facility) from the prospective bidders for design, Supply, Erection, Testing & Commissioning including comprehensive maintenance for a period of 5 years including supply of solar generation & bi-directional meter
- C.O Base panel for 20 KWP solar power plant at BOP Hathichar of 174 Bn BSF under SHQ BSF Dhubri.
- Solar Based Pump On Existing well of Water Supply Scheme at Akpuri tq. Yavatmal
- Consultancy Services for the Energy Audit of electrical Equipments including Solar Rooftop Plant