Implementation of 5.76MWp(DC) GCRT solar PV Plant (CAPEX) including O&M for a period of 5 yrs
135
0
Design, Engineering, Manufacture, Supply, Storage. Civil Work, Erection, Testing & Commissioning of 5.76MWp(DC) Grid Connected Rooftop solar PV Plant including O&M of the Plant for a period of 5 years……
For more information please see above link:
Related posts:
- SUPPLY INSTALLATION AND COMMISIONING OF 02 Nos OFF GRID SOLAR POWER SYSTEM 5 KW
- INSTALLATION OF SOLAR ENERGY BASED DUAL PUMP MINI WATER SUPPLY SCHEME ON EXISTING WELL AT JODATRAI GP KOCHINARA
- SITE VISIT NOTIFICATION : 160 MW SOLAR-WIND HYBRID POWER PLANT WITH BESS INCLUDING 10 YEARS O&M AT RAMAGIRI, AP, INDIA
- Construction of Solar based MRPWSS