Implementation of Roof top Solar PV system on production sheds and service buildings with an aggregated capacity of 1500 KWp on Design Build Finance, Operate and Transfer basis.
137
0
Implementation of Roof top Solar PV system on production sheds and service buildings with an aggregated capacity of 1500 KWp on Design Build Finance, Operate and Transfer basis at wagon repair workshop Jhansi, North Central Railway.
Name : CWM
E-Mail : cwm@jhs.railnet.gov.in
Phone Office : 0510-2440581
Fax : 0510-2440581
Address : Office of CWM,
JHS Workshop,
Jhansi
City : Jhansi
First Announcement Date : 19-March-2016
Publication Date on Portal: 19-March-2016 At : 11:10:35 AM
Last Date of Document Collection : 17-May-2016 Up To : 1:00 PM
Last date for Submission : 17-May-2016 Up To : 3:15 PM
Opening Date : 17-May-2016 At : 3:30 PM
Related posts:
- 100KWP ON GRID ROOF MOUNTED CAPTIVESOLAR POWER PLANT WITH ITS COMPREHENSIVE OPERATION MAINTENANCE UNDER AMC FOR FURTHER 4 YEARS AT GULBARGA DEPOT UNDER KARNATAKA STATE OFFICE
- Construction of 32cum FSTP Plant Boundary wall Approach road and installation of solar panel system and supply of cesspool vehicle etc. including required survey and design work
- Supply and Erecting of Solar Highmask and Solar Street LED light at SorjaTanda. Tq Jintur. Dist. Parbhani
- Supply Of 25 KWp Solar Power Plant