Featured January 12, 2022 Anand Gupta 0 IMPORTANT: Pre-bid meeting for RfS for 1200 MW ISTS-connected Wind Power Projects (Tranche-XIII) – EQ Mag Pro 0 0 0 00 0 0 more now viewing IMPORTANT: Pre-bid meeting for RfS for 1200 MW ISTS-connected Wind Power Projects (Tranche-XIII) – EQ Mag Pro January 12, 2022 Anand Gupta In the Matter of adoption of Tariff bidding procedure by MNRE, Govt. of India for procurement of 215 MW solar power - EQ January 12, 2022 Anand Gupta now playing Petition for adoption of transmission charges System being established by Rajasthan IV C Power Transmission Limited - EQ January 12, 2022 Anand Gupta now playing India May Replace Southeast Asian Nations As Leading Solar PV Exporter To US - EQ January 12, 2022 Anand Gupta now playing NVVN awards contracts worth 66 MW to Kirloskar and Oriana - EQ January 12, 2022 Anand Gupta now playing Adani Green Energy to raise $2 bn via bonds, loans for renewable projects - EQ January 12, 2022 Anand Gupta now playing MoHUA Signs Key MoU with UN-Habitat for Resilient Cities - EQ January 12, 2022 Anand Gupta now playing Odisha Delegation Begins Singapore Visit With Promising Investment Talks - EQ January 12, 2022 Anand Gupta now playing Central Electricity Authority approves the Uniform Protection Protocol for users of the Indian Grid for implementation on Pan India basis - EQ January 12, 2022 Anand Gupta now playing CAQM invokes Stage-IV of the GRAP in the entire Delhi-NCR w.e.f. 08:00 AM of 18.11.2024 (tomorrow) in addition to all actions under Stage I, II and III to prevent further deterioration of air quality in the region - EQ January 12, 2022 Anand Gupta now playing India expresses dissatisfaction on unwillingness by Developed countries to engage on Climate Finance and Mitigation Work Programme at CoP29 in Baku, Azerbaijan - EQ January 12, 2022 Anand Gupta With reference to the RfS issued for selection of Wind Power Developers for Setting up of 1200 MW ISTS-connected Wind Power Projects in India under Tariff-Based Competitive Bidding (Tranche-XIII), the pre-bid meeting has been scheduled on 21.01.2022, at 02:30 PM (IST). The meeting will be conducted through video-conferencing on the Microsoft Teams Platform. Invitations for the meeting will be sent out on 20.01.2022. Prospective bidders interested to participate in the meeting may intimate the names and email ids of respective participants, by mailing to swapnil.gandhi@seci.co.in and jayansh.gaur@seci.co.in, latest by 19.01.2022. SECI may limit the number of participants from each organization to 2 (two), in view of limitations on the Teams platform. Related posts: SECI defers bids submission for 1,200 MW wind-solar hybrid capacities till May 7 Selection of 1200 MW ISTS-connected Wind-Solar Hybrid Power Projects (Tranche-II) Selection of 1200 MW ISTS-connected Solar PV Power Projects (ISTS-VI) SECI Tenders For 1200 MW RE Projects With Peak Power Supply tags: 1200 MW Pre-Bid Meeting SECI Wind Power Projects (Tranche-XIII) 0 00 0 0 previous Toshiba Launches 20Ah-HP SCiBTM Lithium-ion Rechargeable Battery Cell that Delivers Both High Energy and High Power - EQ Mag Pro next Green mobility: IREDA launches scheme to finance battery storage, green hydrogen and fuel cell technologies - EQ Mag Pro Anand Gupta Editor - EQ Int'l Media Network Related Posts Central Electricity Authority approves the Uniform Protection Protocol for users of the Indian Grid for implementation on Pan India basis – EQ November 18, 2024 Anand Gupta 0 CAQM invokes Stage-IV of the GRAP in the entire Delhi-NCR w.e.f. 08:00 AM of 18.11.2024 (tomorrow) in addition to all actions under Stage I, II and III to prevent further deterioration of air quality in the region – EQ November 18, 2024 Anand Gupta 0 India expresses dissatisfaction on unwillingness by Developed countries to engage on Climate Finance and Mitigation Work Programme at CoP29 in Baku, Azerbaijan – EQ November 18, 2024 Anand Gupta 0