Featured January 12, 2022 Anand Gupta 0 IMPORTANT: Pre-bid meeting for RfS for 1200 MW ISTS-connected Wind Power Projects (Tranche-XIII) – EQ Mag Pro 0 0 0 00 0 0 more now viewing IMPORTANT: Pre-bid meeting for RfS for 1200 MW ISTS-connected Wind Power Projects (Tranche-XIII) – EQ Mag Pro January 12, 2022 Anand Gupta now playing SOFAR leading the Indian Market as the “Top 5 String Inverter supplier” for FY 2023-24! - EQ January 12, 2022 Anand Gupta now playing India's power demand may cross 400 GW mark by 2031-32: Power Secretary - EQ January 12, 2022 Anand Gupta now playing Transformers & Rectifiers aims for ₹2,000 crore in revenue for FY25 - EQ January 12, 2022 Anand Gupta now playing Power sector Budget wish list: Funds for green energy, more domestic mfg - EQ January 12, 2022 Anand Gupta now playing MSRDC reissues tender for solar power project for Samruddhi Mahamarg after getting poor response - EQ January 12, 2022 Anand Gupta now playing Green Hydrogen for a clean environment - EQ January 12, 2022 Anand Gupta now playing IREDA CMD Meets CM and Dy CM of Odisha to Boost Green Energy Financing - EQ January 12, 2022 Anand Gupta now playing KEC International bags orders worth ₹1,000 crore for projects in transmission, clean energy sectors - EQ January 12, 2022 Anand Gupta now playing Draft Chhattisgarh State Electricity Regulatory Commission (Terms and Conditions for determination of Multi-Year Tariff) Regulations, 2024 - EQ January 12, 2022 Anand Gupta now playing Draft Delhi Electricity Regulatory Commission (Net Metering for Renewable Energy) (First Amendment) Regulations, 2024 - EQ January 12, 2022 Anand Gupta With reference to the RfS issued for selection of Wind Power Developers for Setting up of 1200 MW ISTS-connected Wind Power Projects in India under Tariff-Based Competitive Bidding (Tranche-XIII), the pre-bid meeting has been scheduled on 21.01.2022, at 02:30 PM (IST). The meeting will be conducted through video-conferencing on the Microsoft Teams Platform. Invitations for the meeting will be sent out on 20.01.2022. Prospective bidders interested to participate in the meeting may intimate the names and email ids of respective participants, by mailing to swapnil.gandhi@seci.co.in and jayansh.gaur@seci.co.in, latest by 19.01.2022. SECI may limit the number of participants from each organization to 2 (two), in view of limitations on the Teams platform. Related posts: SECI defers bids submission for 1,200 MW wind-solar hybrid capacities till May 7 Selection of 1200 MW ISTS-connected Wind-Solar Hybrid Power Projects (Tranche-II) Selection of 1200 MW ISTS-connected Solar PV Power Projects (ISTS-VI) SECI Tenders For 1200 MW RE Projects With Peak Power Supply tags: 1200 MW Pre-Bid Meeting SECI Wind Power Projects (Tranche-XIII) 0 00 0 0 previous Toshiba Launches 20Ah-HP SCiBTM Lithium-ion Rechargeable Battery Cell that Delivers Both High Energy and High Power - EQ Mag Pro next Green mobility: IREDA launches scheme to finance battery storage, green hydrogen and fuel cell technologies - EQ Mag Pro Anand Gupta Editor - EQ Int'l Media Network Related Posts SOFAR leading the Indian Market as the “Top 5 String Inverter supplier” for FY 2023-24! – EQ July 3, 2024 Anand Gupta 0 IREDA CMD Meets CM and Dy CM of Odisha to Boost Green Energy Financing – EQ July 3, 2024 Anand Gupta 0 Operational Guidelines for Implementation of the component ‘Central Financial Assistance to Residential Consumers’ of PM-Surya Ghar: Muft Bijli Yojana – EQ July 2, 2024 Anand Gupta 0