IN REGARD TO THE APPLICATION SUBMITTED FOR IN-PRINCIPLE CLEARANCE FOR INSTALLATION OF FLUE GAS DESULPHURIZATION (FGD) IN THE 3 X 150 MW THERMAL POWER STATION OF HIRANMAYE ENERGY LIMITED – EQ Mag Pro
0
0
IN REGARD TO THE APPLICATION SUBMITTED FOR IN-PRINCIPLE CLEARANCE FOR INSTALLATION OF FLUE GAS DESULPHURIZATION (FGD) IN THE 3 X 150 MW THERMAL POWER STATION OF HIRANMAYE ENERGY LIMITED.
For more information please see below link:
Related posts:
- WBSEDCL FOR ISSUANCE OF APPROPRIATE ORDER THE WBERC AS AMENDED SO THAT CONSUMERS OF WBSEDCL DOES NOT REQUIRE TO BEAR HIGH ENERGY COST OF THERMAL POWER STATION
- IN REGARD TO: WBERC REGARDING REDUCTION OF LATE PAYMENT SURCHARGE
- Petition For Approval of Supplementary to the PPA and the WBSEDCL For Purchase of Entire Exportable Power of 05 MW From the PHASE-I Power Station of SIIPL – EQ Mag Pro
- IN REGARD TO THE APPLICATION SUBMITTED BY IPCL FOR APPROVAL OF DETAILED PROCEDURE FOR RECEIVING AND DISPOSAL OF APPLICATION FOR CONNECTIVITY OF SOLAR PV GENERATING SYSTEM – EQ Mag Pro