In the matter of: Approval for determination of Transmission tariff
0
0
In the matter of: Approval under Regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of Transmission tariff from COD to 31.3.2019 for Asset-1: 63 MVAR, 400 KV Switchable Line Reactor along with 500 Ohms NGR at Rajgarh (POWERGRID) end
of Khargone TPS – Rajgarh (POWERGRID) 400 kV line under “POWERGRID Works associated with Transmission system Strengthening in WR associated with Khargone TPS” in Western Region.
For more information please see below link:
Related posts:
- TNERC:Comprehensive Tariff Order for Biomass based Power Plants
- HERC (Rooftop Solar Grid Interactive Systems Based on Net Metering) Regulations, 2019
- In the matter of: Approval of transmission tariff from anticipated COD
- Petition For Revision of Minimum Quantum of Purchase (in %) From Renewable Energy Sources Percentage Targets for FY 2019 – 20 for Ahmedabad/ Gandhinagar and Surat license areas.