In the matter of: Approval for determination of Transmission tariff

In the matter of: Approval for determination of Transmission tariff

0
0

In the matter of: Approval under Regulation-86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of Transmission tariff from COD to 31.3.2019 for Asset-1: 63 MVAR, 400 KV Switchable Line Reactor along with 500 Ohms NGR at Rajgarh (POWERGRID) end
of Khargone TPS – Rajgarh (POWERGRID) 400 kV line under “POWERGRID Works associated with Transmission system Strengthening in WR associated with Khargone TPS” in Western Region.

For more information please see below link: