IN THE MATTER OF: DETERMINATION OF VARIABLE COST FOR EXISTING BIOMASS, BAGASSE AND INDUSTRIAL WASTE BASED POWER PROJECTS IN THE STATE OF TELANGANA
0
0
IN THE MATTER OF: DETERMINATION OF VARIABLE COST FOR EXISTING BIOMASS, BAGASSE AND INDUSTRIAL WASTE BASED POWER PROJECTS IN THE STATE OF TELANGANA, AND HAVING POWER PURCHASE AGREEMENTS WITH THE DISTRIBUTION LICENSEES, FOR THE PERIOD FROM 01.04.2019 TO 31.03.2020
For more information please see below link:
Related posts:
- TSERC: Commission issues (DEMAND SIDE MANAGEMENT) Regulations No.1 of 2020
- Commission invites Comments on Draft TSERC (Deviation Settlement Mechanism and related matters ) regulation, 2020
- In the matter of Suo-Moto determination of pre-fixed levelised tariff under Component-A of PM-KUSUM Scheme
- Commission passed order between Arhyama Solar Power vs Southern Power Distribution Company of Telangana Limited