![In the matter of: Extension of Pilot on Security Constrained Economic Dispatch (SCED)](https://www.eqmagpro.com/wp-content/uploads/2020/03/Non-compliance-of-the-Central-Electricity-Regulatory-Commission-Payment-of-Fees.png)
In the matter of: Extension of Pilot on Security Constrained Economic Dispatch (SCED)
0
0
In the matter of: Extension of Pilot on Security Constrained Economic Dispatch (SCED)
For more information please see below link:
Related posts:
- Petition – Grant of Connectivity, Long-term and Medium-term Open Access in inter-State Transmission and related matters) Regulations, 2009
- Petition- For Adoption of Tariff for the 480 MW Wind Power Projects (Tranche-VII) connected to the Inter-State Transmission System
- Petition of the CERC (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010
- Determination of Point of Connection (PoC) rates and transmission losses for the period of July to September, 2020