In the matter of: Petition CERC (Power Market) Regulations, 2010 for approval of introduction of the RTM Contracts at IEX
0
0
In the matter of: Petition under Regulation 7 of the Central Electricity Regulatory Commission (Power Market) Regulations, 2010 for approval of introduction of the Real Time Market (RTM) Contracts at Indian Energy Exchange Ltd (IEX).
For more information please see below link:
Related posts:
- Petition – For determination of project specific levelised tariff for 92 MW floating solar Photo Voltaic Plants at RGCCP, Kerala
- Petition of the CERC (Sharing of Inter-State Transmission Charges and Losses) Regulations, 2010
- Calculation of Average Power Purchase Cost (APPC) rate at the national level
- CERC Approves Petition of Pranurja Solution for Registration of Power Exchange
tags:
CERC