In the matter of: Petition for adoption of tariff for 550 MW Wind Power Projects connected to the Inter-State Transmission System
0
0
In the matter of: Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff for 550 MW Wind Power Projects connected to the Inter-State Transmission System and selected through competitive bidding process as per the Standard Bidding Guidelines issued by Ministry of Power dated 8.12.2017.
For more information please see below link:
Related posts:
- Petition- For Adoption of Tariff for the 480 MW Wind Power Projects (Tranche-VII) connected to the Inter-State Transmission System
- Petition for adoption of tariff for the Scheme for 480 MW Wind Power Projects (Tranche-VII)
- Petition for adoption of tariff for the 550 MW Wind Power Projects connected to Inter-State Transmission System
- Petition for revision of tariff of SUGEN Power Plant (1147.5 MW) for the period from 1.4.2014 to 31.3.2019 after truing-up exercise