In the matter of: Petition for adoption of tariff for 840 MW Wind- Solar Hybrid Power Projects
0
0
In the matter of: Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff for 840 MW Wind- Solar Hybrid Power Projects (Tranche-I) connected to the Inter-State Transmission System and selected through competitive bidding process as per the Guidelines issued by Ministry of New and Renewable Energy dated 25.5.2018.
For more information please see below link:
Related posts:
- In the matter of: Petition for determination of tariff of Solapur Super Thermal Power Station (1320 MW) for the period from the actual date of commercial operation of Unit-I
- In the matter of: Petition for determination of tariff of Kudgi Super Thermal Power Station, Stage-I (2400 MW) for the period from COD of Unit-I to 31.3.2019
- In the matter of: Petition for adoption of tariff for 550 MW Wind Power Projects connected to the Inter-State Transmission System
- In the matter of: Extension of Pilot on Security Constrained Economic Dispatch (SCED)