In the matter of: Petition for directions to make Energy Charges as pass through based on the actual fuel cost incurred by the Petitioner
0
0
In the matter of: Petition under Section 79 of the Electricity Act, 2003 read with the provisions of the Power Supply Agreement dated 5.1.2011 and Power Purchase Agreement dated 25.3.2011 for directions to make Energy Charges as pass through based on the actual fuel cost incurred by the Petitioner.
For more information please see below link:
Related posts:
- In the matter of: Determination of Point of Connection (PoC) rates and transmission losses
- In the matter of: Revision of tariff of Uri-II Hydroelectric Project (240 MW)
- In the matter of: Approval under Regulation: 86 of CERC (Conduct of Business) Regulations, 1999 and CERC (Terms and Conditions of Tariff) Regulations, 2014 for determination of Transmission Tariff from DOCO
- Petition for approval of tariff for adoption of tariff for the purchase of 20 MW of solar power from SECI