![In the matter of : Petition for in furtherance to the in-principal approval, dated 25.08.2014 accorded by the Commission for procuring 20 MW power on a long term basis from Solar Energy Corporation of India Limited (SECI)](https://www.eqmagpro.com/wp-content/uploads/2019/03/Petition-for-in-furtherance-to-the-in-principal-approval-dated-14.08.2014-accorded-by-the-Commission-for-procuring-300-MW-solar-power-on-a-long-term-basis.jpg)
In the matter of : Petition for in furtherance to the in-principal approval, dated 25.08.2014 accorded by the Commission for procuring 20 MW power on a long term basis from Solar Energy Corporation of India Limited (SECI)
11
0
In the matter of : Petition for in furtherance to the in-principal approval, dated 25.08.2014 accorded by the Commission for procuring 20 MW power on a long term basis from Solar Energy Corporation of India Limited (SECI) and seeking to allow the power procurement process and the solar Tariff through a transparent process of competitive bidding.
For more information please see below link:
Source: derc.gov.in
Related posts:
- In the matter of : Petition for in furtherance to the in-principal approval, dated 14.08.2014 accorded by the Commission for procuring 300 MW solar power on a long term basis from Solar Energy Corporation of India Limited (SECI)
- Hon’ble Bihar CM Nitish Kumar Inaugurates SCADA-DMS Project Control Centre implemented by Schneider Electric India
- Tiruchi airport to tap solar power
- Anti-Dumping Duty may eclipse solar energy potential in rural India
tags:
dated 25.08.2014 accorded by the Commission for procuring 20 MW power on a long term basis from Solar Energy Corporation of India Limited (SECI) In the matter of : Petition for in furtherance to the in-principal approval