In the matter of:- Petition for issuing necessary directions for fixing the electricity rate as per the for the allocated Solar Power Plants

In the matter of:- Petition for issuing necessary directions for fixing the electricity rate as per the for the allocated Solar Power Plants

0
0

In the matter of:- Petition for issuing necessary directions for fixing the electricity rate as per the FY 2015-16 for the allocated Solar Power Plants with respect to the advertisement date 01.01.2016 published by UREDA in FY 2015-16 and 40% additional tariff for the Solar PV plants installed in the hilly terrain of Uttarakhand.