1. Home
  2. Tenders
  3. In the Matter of: Petition of GERC (T&Cof Intra-State Open Access) Regulations, 2011 and for payment of the unaccounted Solar Energy injected into the System by Captive Solar Power Plant
In the Matter of: Petition of GERC (T&Cof Intra-State Open Access) Regulations, 2011 and for payment of the unaccounted Solar Energy injected into the System by Captive Solar Power Plant

In the Matter of: Petition of GERC (T&Cof Intra-State Open Access) Regulations, 2011 and for payment of the unaccounted Solar Energy injected into the System by Captive Solar Power Plant

0
0

 

In the Matter of: Petition under Section 9 and Section 86 (1) (e), (f) of the Electricity Act, 2003 and Regulation 45 of GERC (Terms and Conditions of Intra-State Open Access) Regulations, 2011 and for payment of the unaccounted Solar Energy injected into
the System by Captive Solar Power Plant.

For more information please see below link:

Anand Gupta Editor - EQ Int'l Media Network

LEAVE YOUR COMMENT

Your email address will not be published. Required fields are marked *