In the Matter of: Petition of GERC (T&Cof Intra-State Open Access) Regulations, 2011 and for payment of the unaccounted Solar Energy injected into the System by Captive Solar Power Plant
0
0
In the Matter of: Petition under Section 9 and Section 86 (1) (e), (f) of the Electricity Act, 2003 and Regulation 45 of GERC (Terms and Conditions of Intra-State Open Access) Regulations, 2011 and for payment of the unaccounted Solar Energy injected into
the System by Captive Solar Power Plant.
For more information please see below link:
Related posts:
- Appointment of EPC contractor for the design as per site conditions erection testing and commissioning of Grid Tied Ground Mounted Solar PV Power plant at Kottiyam in the land owned by KSEBL with installed capacity of 0.60MWp including 5yr O and M
- SUPPLY AND FIXING OF 292 SOLAR STREET LIGHT 12W AT DISTT. LUCKNOW
- Solar Street Light and Solar Mini Highmast
- KELTRON Floats Tender to Supply 170 Nos Solar Panels