In the matter of: Petition of the CERC (Grant of Connectivity, Long-term and Medium-term Open Access in inter-State Transmission and related matters) Regulations
0
0
In the matter of: Petition under Section 79(1)(c) of the Electricity Act, 2003 read with Regulation 27 and 33A of the Central Electricity Regulatory Commission (Grant of Connectivity, Long-term and Medium-term Open Access in inter-State Transmission and related matters) Regulations, 2009 for time extension of achieving financial closure as provided under Clause 9.3.2 of the Detailed Procedure issued by the Central Commission for „Grant of Connectivity to projects based on Renewable sources to the inter-State Transmission System‟ dated 15.5.2018
For more information please see below link:
Related posts:
- In the matter of: Petition for approval of tariff for adoption of tariff for purchase of 50 MW Wind Power from SECI
- In the matter of: Extension of validity of Renewable Energy Certificates (RECs) expired or due to expire
- In the matter of: Petition for approval of introduction of the Green Term-Ahead Market (Renewable Energy) Contracts at Indian Energy Exchange Ltd.
- Petition for Adoption of Tariff for 2000 MW of ISTS Solar Projects