IN THE MATTER OF: Petition of the HERC (T&C for grant of connectivity and open access for intra-state transmission and distribution system) Regulations 2012
0
0
IN THE MATTER OF: Petition under Reg. 53 of the HERC (Terms and Conditions for grant of connectivity and open access for intra-state transmission and distribution system) Regulations 2012
For more information please see below link:
Related posts:
- HERC (Rooftop Solar Grid Interactive Systems Based on Net Metering) Regulations, 2019
- Amendments in the HERC Duty to Supply Electricity on Request and Power to Recover Expenditure and Power to Recover Security Regulations
- Petition for grant of connectivity and open access for intra state transmission and distribution system Regulations, 2012
- HERC reduced tariff payable of Sukhbir Agro Energy by Rs. 0.71/kWh
tags:
HERC