In the matter of: Petition to extend the Control Period for upcoming 10,000 numbers of Grid connected Solar PV Power Plants
0
0
In the matter of: Petition to extend the Control Period of the benchmark capital cost and generic tariff as declared by the Commission vide Order dated 11.05.2020, upto March, 2020 for upcoming 10,000 numbers of Grid connected Solar PV Power Plants of capacity 25 kWp (cumulative capacity of 250 MW)
For more information please see below link:
Related posts:
- Commission passed order in the matter of Suo-Moto Determination of Generic Tariff for electricity generated from RDF based power projects
- Inviting Comments on the Draft UERC (Terms and Conditions for Determination of Multi Year Tariff)
- Petition for approval for Revised Aggregate Revenue Requirement for FY 2002-21
- Inviting Comments on the Petition filed by Uttarakhand Power Corporation Ltd.
tags:
benchmark capital cost GENERIC TARIFF Solar PV Power plants UERC UTTARAKHAND ELECTRICITY REGULATORY COMMISSION