In the matter of revision of tariff for the period 2014-19 in respect of Farakka Super Thermal Power Station Stage-III (500 MW) – EQ
0
0
In the matter of revision of tariff for the period 2014-19 in respect of Farakka Super Thermal Power Station Stage-III (500 MW)
For more information please see below link:
Related posts:
- Petition: Power to Remove Difficulties seeking modification in the adopted CERC Deviation Settlement Mechanism
- Draft Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2024 for the tariff period from 1.4.2024 to 31.3.2029
- Application for Grant of Transmission Licence and other related matters to POWERGRID Ananthpuram Kurnool Transmission Limited for RE generation projects – EQ
- Public Notice inviting Staff Paper on modifications in the GNA Regulations – EQ