In the matter of: Revision of tariff of Uri-II Hydroelectric Project (240 MW)
0
0
In the matter of: Revision of tariff of Uri-II Hydroelectric Project (240 MW) for the period from 11.10.2013 to 31.3.2014-Truing up of tariff determined by Commission’s order dated 4.2.2016 in Petition No. 156/GT/2013