1. Home
  2. India
  3. IndiGrid operationalises greenfield transmission project at Beed, in Maharashtra – EQ
IndiGrid operationalises greenfield transmission project at Beed, in Maharashtra – EQ

IndiGrid operationalises greenfield transmission project at Beed, in Maharashtra – EQ

0
0

In Short : IndiGrid has successfully commenced operations of its new greenfield transmission project located in Beed, Maharashtra, further enhancing the region’s power infrastructure and supporting the reliable transmission of electricity.

In Detail : IndiGrid, India’s first and largest listed power sector infrastructure investment trust (InvIT), has announced that it has operationalised its first greenfield project – Kallam Transmission (KTL) – at Beed, Maharashtra.

The project was won by IndiGrid in December 2021 through the Tariff Based Competitive Bidding (TBCB) mechanism and has been developed on Build, Own, Operate and Maintain (BOOM) basis for a period of 35 years. The project was granted approval for energisation by the authorities on 6th February 2024 and was put to use.

KTL consists of one substation of 2 x 500 MVA capacity with 400/220 kV voltages, as well as 10 Bays with a LILO multi circuit line of ~18 kms. It will enable evacuation of 1 GW of power from renewable energy projects in Dharashiv area of Maharashtra and will play a key role in strengthening the transmission system of the state by improving the grid availability for evacuation & integration of renewable energy. In November 2022, IndiGrid was also awarded augmentation work in the KTL project to enable evacuation of an additional 1 GW of renewable power under the Regulated Tariff Mechanism (RTM).

With evolving expertise, IndiGrid has won five more greenfield projects on TBCB basis in the states of Maharashtra, New Delhi, Gujarat and Madhya Pradesh.

Commenting on the acquisition, Harsh Shah, Chief Executive Officer, and Whole Time Director, IndiGrid, said, “We are delighted to commence the operation of KTL which is our first foray in the greenfield transmission space. We have built sizable execution expertise which enables us to participate in the substantial transmission bidding pipeline on TBCB route. As IndiGrid gears to enter more greenfield opportunities, this project has equipped us with valuable learnings and positions us well for further wins. We are also immensely thankful to the Prime Minister, the PMO and the Ministry of Power for recognizing KTL as a key contributor towards the renewable energy journey of our nation as it will enable evacuation of 2 GW of renewable energy.”

Anand Gupta Editor - EQ Int'l Media Network