Insatallation of 20 KW On Grid photo Voltaic Solar System in Unnao Shuklaganj Development Authority Office building, Unnao
18
0
Insatallation of 20 KW On Grid photo Voltaic Solar System in Unnao Shuklaganj Development Authority Office building, Unnao
Tender Value in Rs.: 13,62,300
For more information please see below link:
Related posts:
- Offgrid Solar System
- Supply Installation and commissioning and maintenance for 5 years of Solar Energy Based mini water supply in Musahar Basti of Chatara Block in District Sonebhadra under DMF Program
- AMC for 01 No 100 KWP Off Grid Solar Power Plant at Tuensang HQ 7 Sector AR
- 250MW Solar Photovoltaic Grid- Connected Power Plant Ranging From 20 Mw To 60 Mw At Various Substations Of GETCO In The State Of Gujarat
tags:
Insatallation of 20 KW On Grid photo Voltaic Solar System in Unnao Shuklaganj Development Authority Office building Unnao