INSTALLATION AND CMC FOR A PERIOD OF 5 YEARS OF 65 KW CAPACITY GRID CONNECTED SOLAR PV POWER PLANT
0
0
INSTALLATION, TESTING, COMMISSIONING AND CMC FOR A PERIOD OF 5 YEARS OF 65 KW CAPACITY GRID CONNECTED SOLAR PV POWER PLANT UNDER ROOF-TOP NET METERING AT CHARKHAGRUH OR SABHAGRUH SEVAGRAM, DISTRICT WARDHA IN THE STATE OF MAHARASHTRA
For more information please see below link:
Related posts:
- Establishment of 12 KWp Grid Connected Solar Power Plant at Rameswaram DGPS Station under Chennai Directorate, Tamilnadu State
- TENDER UPLOADING AND PRE-BID MEETING NOTIFICATION: TENDER FOR DESIGN & EPC OF 05 MW (AC) SOLAR PV POWER PLANT WITH INDIGENOUS CE
- Solar Street Ligt at Alwan Tal. Taloda
- REPAIR AND MAINTENANCE OF SOLAR LIGHTS