DESIGN FABRICATION SUPPLY INSTALLATION TESTING COMMISIONING AND OPERATION AND MAINTENANCE FOR A PERIOD OF 5 YEARS OF TOTAL 83 KW CAPACITY GRID CONNECTED SOLAR PV POWER PLANT UNDER ROOF TOP NET METERING AT 3 DIFFERENT LOCATIONS IN CHANDRAPUR
Tender Value in Rs.: 54,35,000
For more information please see below link:
Related posts:
- MNRE: Guideline For selection of 3000MW Grid-Connected Solar PV Power Projects under NSM, Phase-II, Batch-II, Tranche-I,”State Specific Building Scheme”-Modification, reg.
- Supply, erection, commissioning and testing of 250 KWP Solar ongrid power plant at TNPA, Oonamanchery near Vandalur in Chennai City.
- 5 KW CAPACITY GRID-CONNECTED SOLAR PV POWER PLANT
- REPAIR MAINTENANCE OF STREET SECURITY PERIMETER LIGHT SOLAR LIGHT OF ZONE A JASSAI UNDER GE ARMY BARMER
tags:
Installation And Comissioning of 83 KWp SPV Power Project with 5 Year CMC All Inclusive as per NIT