![INSTALLATION AND COMMISSIONING OF 2 MWP SOLAR POWER PLANT AT JALIPA UNDER GE BARMER WITH AMC PERIOD OF 5 YEARS](https://www.eqmagpro.com/wp-content/uploads/2018/08/INSTALLATION-AND-COMMISSIONING-OF-2-MWP-SOLAR-POWER-PLANT-AT-JALIPA-UNDER-GE-BARMER-WITH-AMC-PERIOD-OF-5-YEARS.png)
INSTALLATION AND COMMISSIONING OF 2 MWP SOLAR POWER PLANT AT JALIPA UNDER GE BARMER WITH AMC PERIOD OF 5 YEARS
50
0
OFFER FOR DESIGN ENGINEERING SUPPLY ELECTRICAL WORK INCLUDING LAYING OF TRANSMISSION LINE PACKING AND TRANSPORTATION STORAGE INSTALLATION AND COMMISSIONING OF 2 MWP SOLAR POWER PLANT AT JALIPA UNDER GE BARMER WITH AMC PERIOD OF 5 YEARS
Tender Value in Rs.: 2 Crore 50 Lakhs
For more information please see below link:
Related posts:
- Request for proposal towards Design, Installation, Commissioning, Operation, Maintenance a Supply of power to IREL of grid connected 5MWp Solar Power Plant on Build Own Oper
- Erection and commissioning of solar wind hybrid system at raw water pumphouse
- Providing And Erecting Solar Street Light For (Kari Indera Nagar) And (Kari Dalit Wasti0At GP Kari . TAL DHARUR DIST BEED