Installation , Commissioning followed by Five years Comprehensive Maintenance of Grid Connected Rooftop solar PV Power Plants of cumulative capacity 3.34 MWp for WBSEDCL
49
0
Installation , Commissioning followed by Five years Comprehensive Maintenance of Grid Connected Rooftop solar PV Power Plants of
cumulative capacity 3.34 MWp for WBSEDCL , individual plant capacity being 5 KWp , at WBSEDCL/WBSETCL & other
Govt./Govt. Undertaking office Building at various locations of different District of West Bengal on Turnkey basis under Integrated Power Development Scheme (IPDS) through 16 nos packages
For more information please see below link:
Related posts:
- Electrical works (lighting, switching, wiring etc.) has to done in B Hangar to get better illumination for Solar shop after removal old fitting.
- Request For Selection (RfS) For Procurement Of Power On Long Term Basis Through Competitive Bidding Process (Followed By Reverse E-Auction ) From 1000 MW Grid Connected Solar Photovoltaic Power Projects
- S/I OF 15 W SOLAR LED STREET LIGHT AT 50 D/F PLACES IN PARLIAMENTARY CONSTITUENCY OF JALAUN GARAUTHA BHOGNIPUR, U.P.
- UREDA Floats Tender For Offgrid Solar Power Plants Battery Bank