![Installation of Solar Power Based Electrolytic De-fluoridation Plant](https://www.eqmagpro.com/wp-content/uploads/2020/06/Retender-of-Sale-of-RE-Non-Solar-Power-on-Short-Term-basis.jpg)
Installation of Solar Power Based Electrolytic De-fluoridation Plant
0
0
Installation and Commissioning of Solar Power Based Electrolytic De-fluoridation Plant with Proper Environmentally Sustainable Reject Management System and successfully running for 10 years as O M period for Fluoride affected at Block Fathepur
Tender Value in ₹ 10,55,018
For more information please see below link:
Related posts:
- Design, Supply, Installation, Commissioning with 5 years Comprehensive Warranty Maintenance of Solar PV Power Packs of 200 Watt
- Supplying And erecting High Mast Solar Street Light at Kanherwadi Tq. Kallam Dist. Osmanabad
- 30 KWp On Grid Roof Mounted Captive Solar Power Plant with its Comprehensive Operation and Maintenance under AMC for further 4 Years at Location COCOs at Chainage
- Supply of 234 Units Solar power based Arsenic/Fluoride Removal Unit including Solar panels of desired capacity
tags:
DWSD