Installation of Solar Power Based Electrolytic De-fluoridation Plant with Proper Environmentally Sustainable Reject Management System
0
0
Installation and Commissioning of Solar Power Based Electrolytic De-fluoridation Plant with Proper Environmentally Sustainable Reject Management System and successfully running for 10 years as O M period for Fluoride affected at Block Fathepur
The last date to submit the bids is November 27, 2020
For more information please see below link: