JOB WORK ORDER FOR SOIL TESTING C-1431 PROVN OF SOLAR POWER PLANT OF CAPACITY OF 4 MW AT MEERUT (AMWP2016-17/LIST-IV /SRL-46) GE (UTILITY) MEERUT CANTT
8
0
JOB WORK ORDER FOR SOIL TESTING C-1431 PROVN OF SOLAR POWER PLANT OF CAPACITY OF 4 MW AT MEERUT (AMWP2016-17/LIST-IV /SRL-46) GE (UTILITY) MEERUT CANTT
For more information please see below link:
Related posts:
- Extension of Bid Submission deadline for Selection of 2 MW Solar PV Projects at Thurputallu, AP
- Providing Solar Street Light at Jawahar Navidaya vidhyalya Tuljapur Dist. Osmanabad
- Consultancy Services for Providing Assistance in Procurement of Power from Solar and or Wind Sources
- Design, Engineering, Manufacturing, Supply, Packing and Forwarding, Transportation, Unloading, Storage, Installation, Testing and Commissioning of 10 KWp capacity Captive Solar Photovoltaic Project