Madhya Pradesh Policy for Net-Metered Renewable Energy Applications, 2016
149
0
A Renewable Energy based power plant is installed on the roof, open space, walls, agriculture farm, etc., i.e., within the legal premises, of the customer to generate electricity. The power thus generated is first used in the building for captive requirement and the surplus power is fed to the grid of DISCOM. In case power requirement of the building is more than the power being generated, the extra power requirement is drawn from the grid. more informationDraft Net Metering Policy and Formats
Related posts:
- Madhya Pradesh Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2017.
- Transmission Scheme for evacuation of power from Polavaram Hydro Electric Power project 960 MW
- Seeking extension of time for the commercial operation of the Solar Power project
- Petition of Adani Electricity seeking to remove difficulty, appropriate directions of the MERC (Deviation Settlement Mechanism and Related Matters) Regulations, 2019