MEDA Issues Tender For 70 KW Solar PV Power Plant At 07 Various Offices Of Collector Office
0
0
TOTAL 70 KW DISTRIBUTED CAPACITY GRID CONNECTED SOLAR PV POWER PLANT WITH ROOFTOP NET METERING AT 07 VARIOUS OFFICES OF COLLECTOR OFFICE PREMISES IN GONDIA DISTRICT AND 25 NOS. OF SOLAR LED STREET LIGHT AT COLLECTOR BUNGLOW, GONDIA WITH 5 YEAR CMC
The last date to submit the bids is January 21, 2021
For more information please see below link:
Related posts:
- MEDA Issues Tender For Total 116 KW Rooftop Solar Power Projects
- MEDA Floats Tender For 130 kWp Solar PV Projects At Sports Complex
- Supply Of total 115 kW Capacities GCRT project under Net Metering System at 3 government buildings in Amravati
- Total 200 kw capacity grid-connected Solar PV Power Plant