“Methodology for Computing ‘Deterrent Charges’ or maintaining lower coal-stock by coal-based thermal generating stations – EQ Mag Pro
0
0
“Methodology for Computing ‘Deterrent Charges’ or maintaining lower coal-stock by coal-based thermal generating stations.
For more information please see below link:
Related posts:
- Petition For Grant of Transmission License Under Section 14 of the Electricity Act, 2003
- Petition of the PPA executed between Yarrow Infrastructure Private Limited and National Thermal Power Corporation Limited for seeking approval of Change in Law events due to enactment of the GST Laws – EQ Mag Pro
- Petition For truing up of transmission tariff of the 2014-19 tariff period and determination of transmission tariff for the 2019-24 tariff period for Transmission System – EQ Mag Pro
- Petition for approval of introduction of the Hydro Two Day Ahead Contracts, Hydro Green Term Ahead Contracts, Weekly Uniform Price Contracts – EQ Mag Pro