MNRE: Guidelines for Selection of 3000 MW Grid-connected Solar PV Power Projects under NSM, Phase-II, Batch-II, Tranche-I, “State Specific Bundling Scheme” – Amendment, reg.
133
0
The undersigned is directed to refer to the Guidelines for Selection of 3000 MW Grid-connected Solar PV Power Projects under NSM, Phase-II, Batch-II, Tranche-I, “State Specific Bundling Scheme” – Amendment, reg…..
For more information please see above link:
Related posts:
- Seeking clarification on the issue involved
- Petition CERC (Grant of Connectivity, Long-term and Medium-term Open Access in inter-State Transmission and related matters) Regulations, 2009
- ORDER: To pay to the Petitioner, the sum of Rs.52.74 Crores with Interest
- KERC Dismissed Petition of Emmvee Solar Systems