Programme/Scheme wise Cumulative Physical Progress as on July, 2022 |
|||
Sector | FY- 2022-23 | ||
Achievements
(April -July 2022) |
Cumulative Achievements (as on 31.07.2022) |
||
I. Installed RE Capacity (CAPACITIES IN MW) | |||
Wind Power | 535.75 | 40893.33 | |
Solar Power* | 3977.26 | 57973.80 | |
Small Hydro Power | 39.00 | 4887.90 | |
Biomass (Bagasse) Cogeneration | 0.00 | 9433.56 | |
Biomass(non-bagasse)Cogeneration | 0.00 | 772.05 | |
Waste to Power | 0.00 | 223.14 | |
Waste to Energy (off-grid) | 0.00 | 253.61 | |
Total | 4552.01 | 114437.39 |
For more information please see below link:
Related posts:
- India installed Solar Power Capacity as of May, 2022 stood up at 56,951.35 MW: MNRE – EQ Mag Pro
- MNRE Issues Clarification on Applicability of ALMM Order
- Extension For Installation of Grid-Connected Solar Power Plants Under Component – A of Pm Kusum Scheme – EQ Mag Pro
- Wind Turbine Models included in the RLMM after declaration of new procedure (i.e 01 November 2018) – EQ Mag Pro