MNRE:Guidelines for implementation of “Scheme for Setting up of 1000 MW ISTS -connected Wind Power Projects”
74
0
The “Scheme for Setting up of 1000 MW ISTS – connected Wind Power Projects” sanctioned by the MNRE provides for issuance of Guidelines1 by the Ministry for transparent bidding process for implementation of the Scheme.
For More Information Pls.Go Through Below Attached Documents…
Related posts:
- Oldbaum and Leosphere announce 1GW of offshore wind data campaigns underway at French sites
- Suzlon order wins continue; receives maiden order of 105 MW from Greenko Group
- Opinion | Biofuels are a sensible option for India
- Evidence for man-made global warming hits ‘gold standard’ level of certainty, say scientists