MNRE:Scheme for setting up of over 50MW of Grid-connected solar PV Power Projects in high visibility areas with viability Gap Funding under Batch-VI of Phase-II of JNNSM
205
0
The recent announcement of government of India for revision of the target for solar power under National Solar Mission to 1,00000 MW by 2022 has generated great enthusiasm towards solar energy from all quarters.more information…Scheme-50MW-Grid-Connected-SPV-with-VGF-under-JNNSM
Related posts:
- Hyderabad water board to utilise solar power to cut down on bills
- Gujarat solar projects get bids of 600 MW despite low ceiling tariffs
- Public sector enterprises gradually diversifying into green energy
- India Ratings Affirms Niranjana Solar Energy’s Bank Facilities at ‘IND BBB-(CE)’/Negative; Off RWN